New Roof Examples

New Roof Examples

New Roof Installation, Roof Removal and Tear-Off Examples in New Jersey

September 27, 2024
Removed all previous roofing off of the entire house in Millstone township, New Jersey. We installed a new Owens Corning roof duration 50 year shingles. We also installed all new roof vents. We provide the longest guarantee of any roofer in New Jersey.
September 25, 2024
These two barns where a little over 100 years old. We removed the old cedar shake roofing. Installed new 5/8 cdx. An Owens Corning duration 50 year roof. New roof vents. Added collar ties to the rafters. Just needs a coat of paint now.
September 24, 2024
East Brunswick township “Historical Society” had us replace a roof on this landmark old farm. We removed old roofing. Replaced bad plywood sheathing. New roof vents. Installed a 50 year Owens Corning roof. Reinstalled old lightning rods. All finished in one day.
September 23, 2024
The entire Mansard roof was removed. New Tamko Heritage 30 year roofing is installed. These type of roofs take a long time to do because of the steep walls.
September 22, 2024
This approximate 300 year old historical home in Branchburg, NJ could not wait much longer for a new roof. We removed the old slate roof. Repaired any damaged 3/4 inch pine boards. Installed a new 50 year Owens Corning Duration roof. Gutters will be put up in a few months.
September 21, 2024
This old smoke house had a rotted cedar shake roof. The rafters and horizontal 5/4 nailers where also rotted. After tearing it all off, we rebuilt it as close as possible to original. New rafters, 5/4 spruce nailers, and a cedar wood shake roof.
September 20, 2024
This historic home built around 200 years ago in Cranbury NJ, needed a new roof. The owners wanted a new cedar shake roof. This very expensive roof should be in place for the next 70 or 80 years. The owners had to be very careful who they chose for this project. We removed the old slate roof over woodshake. Installed all new 1×4 pine horizontal boards. Roofing felt is installed in between each row. All new shakes are spaced correctly to allow for expansion. Another beautiful job by John Asch Contracting.
September 19, 2024
Originally this was a “barn slate” that we tore off. The client wanted a new roof that would remind them of slate, so we installed this GAF square bottom slate roof with open aluminum valleys .
September 18, 2024
After we removed all the existing spanish tile on the front lower porch, we came across all types of rotted wood decking and rafters. We rebuilt new rafters, using all pressure treated material, new plywood decking and 2 layers of ice and water shield because of the long expected life of the new spanish tile roof. All the corner edges of the tiles are cut with a special wet saw and when the final tile ridge caps are installed, they must be set in wet concrete. Normally, you can expect approximately 80 to 90 years from the new tile roof it is installed on a good pitch as the upper portion of the house. However, this front porch with its lower slope will only last 60 to 70 years.
September 17, 2024
Installed a new Tamko 30 year Rustic Evergreen roof:
September 16, 2024
This house on the historical register in Cranbury, NJ needed a lot of work. We tore off the roof. Replaced rotted plywood. Fixed carpentry mistakes left there by the last contractors. Installed two new roof fans/six roof vents. Installed Karnak 220 emulsion over the existing copper built in gutters & on the 1st floor low sloped roofs.
September 15, 2024
We removed 2 layers of asphalt roofing & wood shake roofing down to the rafters. Installed new 5/8 CDX. New 30 year Tamko roof. 4 new roof vents. This roof color is “Old English Pewter”
September 14, 2024
So far we have installed a new Tamko 30 year roof on about half of the building with many roof vents. We are coating the old rubber roof with a Karnak silver fibrated emulsion #220 to reflect the suns harmful rays & make the roof last longer. This will also cool down the interior of the building.
September 13, 2024
This particular house had orange flat terra cotta tiles which were constantly leaking. After a few years of my company repairing these tiles with new leaks appearing in other locations, the homeowner opted to tear off this roof and install a 30 year Tamko dimensional roof. We also installed new aluminum coil around the windows and new vinyl soffit (see last photo).
September 12, 2024
We had to totally remove the old rotted, built-in gutters, extended and lengthened the roof rafters, and lowered the soffit area.
September 11, 2024
Removed old roofing & installed a Tamko Dimensional roof on most of the house. Installed four new Velux fixed skylights. Two new Pro-3 roof fans. There was an approximate 15ft x 15ft flat roof on the house not visible from the ground. This had to be changed to a ” Low-sloped” roof so we could install a glue down rubber roof & Guarantee against future leaks. New rafters/plywood was installed. Then a full coat of ice & water shield before the final glue down roof.
September 10, 2024
Installed a 30 year Tamko roof along with 8 new Velux skylights at this Dentist office in Monroe.
September 9, 2024
We had to tear off the roof and then we fixed problem gutter area. We then had to sister in new rafter tails. Installed New fascia, new roof & aluminum gutters.
September 8, 2024
While installing a new roof in Skillman, NJ. On Hillside Terr. We discovered most of the house had bad plywood due to improper installation of insulation ¬t enough ventilation. Installing all new plywood, 50 year Owens Corning roof with a 20 year guarantee. Six new Velux skylights all with a 10 year guarantee.
September 7, 2024
On this home we installed vertical vinyl siding and trim. We also installed a new Tamko roof with all new roof fans and vents:
September 6, 2024
We installed a 30-year Tamko dimensional roof on the entire house.
September 5, 2024
We removed all roofing off the entire house, porches and detached garage. We fixed the rotted wood and installed an algae resistant Tamko Dimensional Roof (Mountain Slate). 5 roof vents were installed. Enjoy the BEFORE/AFTER pictures.
September 4, 2024
We removed the entire roof and 6 old skylights. Then we installed a new 30 year GAF Timerline Roof with 8 roof vents. We also put in 6 new Velux Skylights and 3 roof fans.
September 3, 2024
The old roof on this house was put together a little at a time, all wrong. We completely tore it up, added rafters and fixed rotted plywood. We installed new flashings underneath vinyl siding. Install Ice & Water shield. Install a glue down rubber roof. New aluminum edgings. The final product comes with a 10 year guarantee.
September 2, 2024
As you can see by the photos, this homeowner has multiple skylights which were leaking. Also, the home had severe algae and moss problems and in some areas, this moss was an inch thick. My crew tore off the entire roof down to the existing plywood sheathing and installed ice and water shield on top of the newly repaired plywood on the entire house. We then installed all new Velux sky­lights and an algae resistant Tamko dimensional roof to prevent the return of algae.
September 1, 2024
The owner of this roof waited about 6 years longer then they should have and they had no attic ventilation. This is what happens!!
August 31, 2024
The owner of this home in Piscataway, NJ wanted to have solar panels installed after we put on the new roof. We had to install special pipe flanges around approx. 75 pipe bases! They have to all be 100% water proof.